91 | Routine mechanised maintenance of Pabbo-Atiak-Nimule road (69km) | Ministry of Works & Transport | Ministry of Works & Transport |
* Heavy grading, culvert installation.
* Repair and reconstruction of stone pitching.
* Shoulder repair. Completed in 2006
|
92 | Remedial works at Kaabong and Abim hospitals | Ministry of Health | Ministry of Health |
Construction of new buildings and rehabilitation of existing buildings. Completed in 2006
|
93 | Routine mechanised maintenance of Wesunire-Kakoge road (14km), Nakabira-Nawantale (12km), & Nakawe-Kisakye road (17km) | Ministry of Works & Transport | Ministry of Works & Transport |
Heavy grading, culvert installation. Completed in 2006
|
94 | Proposed construction of Stanbic Bank Kakira branch building | Kakira Sugar Limited | Kakira Sugar Limited |
Construction of bank building. Completed in 2006
|
95 | Port road (140km) | Ministry of Works & Transport | Ministry of Works & Transport |
Heavy grading, regravelling, culverts laying and storm water drain. Completed in 2005
|
96 | Construction and rehabilitation of selected PTP centres in Uganda | Ministry of Education & Sports | Icon Institute - GET/JBG |
Construction of new and rehabilitation of existing buildings for classrooms, dormitories, kitchen, and workshops. Completed in 2005
|
97 | Construction of laboratories and libraries in selected secondary schools, Lot II | Ministry of Education & Sports | Arch Design Architects & Engineers |
Construction of new buildings for laboratories and libraries. Completed in 2005
|
98 | Caneyard paving at Kakira Sugar Works, Phase I, II & III | Kakira Sugar Works | Kakira Sugar Works Limited |
Caneyard paving. Completed in 2005
|
99 | Routine mechanised maintenance of Natete-Nakawuka-Kasanje/Kisubi road (38km) | Ministry of Works & Transport | Ministry of Works & Transport |
Grading and regravelling. Completed in 2005
|
100 | Construction of Arua Power Plant | Mantrac Uganda Limited | Mantrac Uganda Limited |
Construction of foundation for generator, floor slabs for generator platform, booster and oil lube bases etc. Completed in 2004
|