Click on the map to explore our projects across Uganda, or browse the case studies below to see the range of work we’ve delivered. From urban centers to remote regions, Excel Construction has the capacity and expertise to operate anywhere in the country. Don’t hesitate to get in touch—we’re ready to bring your vision to life, wherever you are.
| Project | Client | Work Involved | District |
|---|---|---|---|
| Construction, refurbishment, and equipping of Busolwe General Hospital | Ministry Of Health UG&A | Construction of new: Casualty Ward, Placenta Pit, Incinerator, Attendants' Laundry, Ablution Facilities Refurbishment of: Existing OPD, Storage & Kitchen, Mortuary, Administration Block | Butaleja District |
| Construction of a 70-bed Mother Kevin Wing at St. Francis Hospital Nsambya, Kampala | St. Francis' Hospital Nsambya | Construction of a new 70-bed ward – Mother Kevin Wing | Kampala |
| Construction of the St. Francis Nsambya Hospital Training School’s administration and classroom block | St. Francis Nsambya Hospital | Completed in 2021 | Kampala |
| Construction of regional referral hospitals in the Northern Uganda and Acholi districts of Gulu, Lira, and Arua | Ministry Of Health UG&A | Construction of Regional Referral Hospitals in Gulu, Lira & Arua | Arua, Lira, Gulu |
| Refurbishment and equipping of Kawolo General Hospital | Ministry Of Health UG&A | Construction of: New OPD, Casualty Ward, Main Operating Theatre, Mortuary, Antenatal Block, Kitchen, Laundry, Generator House & Gate House Refurbishment of: Existing OPD, Maternity Block, Antenatal Block, Paediatric Wards, Service Block Renovation of all hospital utility systems: Water supply distribution & storage system, electrical system, sewage system | Buikwe |
| Construction and supply of medical equipment for Kabale and Hoima Hospitals | Iwata Chizaki Inc | Construction of new OPD & Casualty Ward Completed in 2015 | Kabale & Hoima |
| Construction and renovation of Anaka General Hospital in Nwoya District | Ministry of Health | Construction of: New OPD, New Casualty Building, Attendants’ Kitchen, Attendants’ Laundry. Renovation of: Existing OPD, Existing Medical Wards, Existing Lagoon | Nwoya |
| Construction of Moroto Regional Referral Hospital | Ministry of Health | Construction of: New OPD, Placenta Pit, Generator House, Medical Waste Pit, Staff Houses (both 3- and 2-bedroom, 4-unit staff houses) External works including landscaping & 400-user septic tanks, drilling of boreholes | Moroto |
| Rehabilitation of hospitals and supply of medical equipment in the Central Region of Uganda | Zenitaka Corporation | Direct temporary works, earthworks, foundation works, rebar works, concrete works, pre-fabricated concrete works, stone works, roofing & gutter works, metal works, plastering works, door & window works, painting works, interior & exterior finishing works | Masaka & Mubende |
| Uganda Blood Transfusion Services (UBTS), Nakasero, Kampala, Uganda | American Consulate General Frankfurt Regional Procurement Support Office (RPSO) | Construction of main building. Extension to existing office building (adding 1st & 2nd floors to ground floor) including all electrical, mechanical works, fire fighting, air conditioning. Renovations to the existing canteen & store, new generator house, driveway, boundary wall & gates. Landscaping | Kampala |
| Construction of Buliisa Health Center IV in Buliisa District | Tullow UG&A Operations Pty ltd | Construction of the following: Outpatient Department, General Ward, Operating Theatre, Staff Houses, Generator House, Double Laundry/Baths/VIP Latrines (General Ward), Double Baths/VIP Latrines (Staff), Double VIP Latrines (Public), Placenta Pit, Medical Waste Pit | Bulisa |
| Construction of Mbarara Hospital at Plot 8–18, Hospital Road, Mbarara (Phase 1) | Ministry of Health | Construction of hospital main complex which comprises of Blocks A, B, C. Construction of Mental Health Unit which comprises of Psychiatric Unit, Attendants' Unit & Laundry Block. Electrical & mechanical installations, associated external works | Mbarara |
| Construction and renovation of Mukono Health Centre | American Consulate General Frankfurt Regional Procurement Support Office (RPSO) | Construction of new laboratory building, gas & solar installations, mechanical & electrical installations | Mukono |
| Proposed medical ward at Arua Hospital | Ministry of Health | Demolition of existing building & construction of ground floor of two-storey building with an upgraded sanitary system | Arua |
| Rehabilitation and remodeling of Orum Health Centre IV in Lira District | Ministry of Health | Rehabilitation of existing buildings & construction of new buildings | Lira |
| Rehabilitation and remodeling of Okwang Health Centre III in Lira District | Ministry of Health | Rehabilitation of existing buildings & construction of new buildings | Lira |
| Proposed partial renovation of Itojo Hospital | The Embassy of the Arab Republic of Egypt | Rehabilitation of existing buildings, rehabilitation of external sewerage & water supply systems & construction of three staff houses, replacing of roof for the ward block | Ntungamo |
| Completed in 2006 | Kaabong | ||
| Rehabilitation and remodeling of nine health centres and construction of one new mental health unit in West Nile | Ministry of Health | Construction of new building & renovation of existing buildings in West Nile region | Arua, Pakwach |
| Construction and equipping of health centres in Kamuli and Kisoro Districts | Ministry of Health | Construction of new buildings & renovation of existing buildings | Kisoro & Kamuli |
| Rehabilitation of selected health centres in Bugiri, Jinja, Kiboga, Masindi, and Mubende Districts | Ministry of Health | Construction of new health centres & renovation of existing buildings | Jinja.Bugiri,Kiboga,Masindi & Mubende |
| Construction of Children’s Orthopedic Hospital, Phase I and II | C Cure | Construction of hospital buildings including all infra works | Arua |
| Project | Client | Work Involved | District |
|---|---|---|---|
| Construction of a new mill at Kakira Sugar Ltd., Jinja | Kakira Sugar Ltd. | Construction of new mill | Jinja |
| Construction of a yoghurt and UHT plant for Jesa Dairy Farm Ltd. at Busunju | Jesa Dairy farm ltd. | Construction of a new yoghurt & UHT plant for Jesa | Wakiso |
| Construction of Greenfield Breweries in Mbarara | Nile Breweries Limited | Construction of a new brewery in Mbarara District | Mbarara |
| Construction of a new evaporator station | Kakira Sugar Limited | Construction of new evaporator station at Kakira Sugar | Jinja |
| Construction of Effluent Treatment Plant (ETP) | Kakira Sugar Limited | Execution of civil works of new ETP at Kakira Sugar Ltd | Jinja |
| Construction of B-type Continuous Vacuum Pan (B-CVP) | Kakira Sugar Limited | Civil works, concrete foundation & drainage works | Jinja |
| Construction of Malting Plant at Nile Breweries Limited | Nile Breweries Limited | Construction of a new malting plant at Nile Breweries Limited | Jinja |
| Construction of Effluent Treatment Plant at Nile Breweries | Nile Breweries Limited | Construction of tanks, water retaining structure | Jinja |
| Construction of Outgrowers Offices at Kakira Sugar Limited | Kakira Sugar Limited | Construction of an office building, building guard house, parking yard & all electrical & mechanical works | Jinja |
| Construction of Tropical Africa Bank, Kakira Sugar Works Branch | Tropical Africa Bank | Construction of bank building, construction of boundary wall & all electrical & mechanical works | Jinja |
| Relocation of main gate at Nile Breweries, Jinja | Nile Breweries Limited | Relocation of trade gate & construction of security offices & weighbridge shed | Jinja |
| Extension to brewhouse at Nile Breweries Limited, Jinja | Nile Breweries Limited | Construction of extension to the existing brewhouse | Jinja |
| Renovation and extension of packing hall at Nile Breweries Limited, Jinja | Nile Breweries Limited | Renovation & extension of packing hall at Nile Breweries | Jinja |
| Contract for earthworks, construction, steelwork erection, and general building works associated with the Nile Breweries cellar expansion, control room, and yeast room | High - Tech Processing (Pty) Limited | Earthworks, construction, steelwork erection & general building works associated with NBL cellar expansion | Jinja |
| Construction of a boiler house at Nile Breweries Limited | High - Tech Processing (Pty) Limited | Construction of a boiler house | Jinja |
| Upgrading of packaging route at Nile Breweries Limited | Nile Breweries Limited | Replacement of roofing sheet of the packaging hall | Jinja |
| Contract for the earthworks, construction, steelwork, and general building works associated with the new facilities for Southern Sudan Breweries Limited | EGC Consulting Engineers | Construction of new building for brewery in Juba, Southern Sudan, one factory block, four accommodation blocks, one laundry block | Sudan |
| Upgrading of bottler washer at Nile Breweries Limited | Nile Breweries Limited | Upgrading of bottle washer | Jinja |
| Cane yard paving at Kakira Sugar Works, Phases I, II, and III | Kakira Sugar Works | Caneyard paving | Jinja |
| Construction of Arua Power Plant | Mantrac UG&A Limited | Construction of foundation for generator, floor slabs for generator platform, booster & oil lube bases, etc. | Arua |
| Roads and stormwater upgrade and associated works at Nile Breweries Ltd., Contract No. 24003/01, Phase I | Nile Breweries Limited | Roads & storm water upgrade | Jinja |
| Proposed Hoffman Kiln at Uganda Clays Limited | UG&A Clays Limited | Construction of a new Hoffman kiln | Kampala |
| Factory lower level of the proposed garment factory complex for Tri-Star Apparel at Spring Road, Bugolobi, Kampala | UG&A Property Holdings Ltd. | Renovation of existing factory lower level; work includes plastering, painting & electrical installation | Kampala |
| Nile Breweries Limited, Phase II | Nile Breweries Limited | Storage tank foundations, structural steel fabrication & erection for a tank farm | Jinja |
| Construction of warehouse at Nile Breweries, Phase III | Nile Breweries Limited | Construction of warehouse | Jinja |
| Nile Breweries, Phase IV | Nile Breweries Limited | Contract for earthworks, construction, steelwork erection & general building works associated with the Nile Breweries cellar expansion, control room & yeast room | Jinja |
| Construction of 14 houses for Salini | Impregilo Salini JV | Construction of fourteen houses at Masese | Jinja |
| Kakira Sugar Pan Foundations | Kakira Sugar Limited | Construction of pan work foundations for Kakira Sugar Works | Jinja |
| Construction of base station buildings for MTN – Phase II | MTN (UG&A) Limited | Civil & electrical work on base station buildings at various locations in the country | |
| Civil and building works for Nile Breweries, Jinja, Phase I | Nile Breweries Limited | Storage tank foundations, structural steel fabrication & erection, pump house buildings & laying of water mains | Jinja |
| MTN cell radio installation, Phase I | MTN (UG&A) Limited | Civil works for nine cell radio stations | Jinja |
| Construction of ten houses | Kakira Sugar Works | Construction of ten houses for staff | Jinja |
| Construction of new houses and renovations | Mweya Safari Lodge Ltd. C/O MM & Co. Limited | Renovation of existing rooms and staff quarters, construction of ten new houses | Jinja |
| Concrete paving of cane yard | Kakira Sugar Works | Cane yard concreting | Jinja |
| Construction of fish plant | Gomba Fishing | Construction of: multi-storey flats for staff, boys’ quarters, petrol station, fish mill & fish oil plant, smoking & blast freezers, cold rooms, flake ice plant, cleaning & processing plant, packing rooms, plate freezer, power house, compressor room, piers, weighbridge & office/factory block complete with infrastructure & services | Jinja |
| Construction of bottling storage hall | Nile Breweries Limited | Alteration & renovation of factory, senior staff quarters, brewhouse & fermenters Construction of new bottling storage hall | Jinja |
| Rehabilitation of factory, construction of dispensary, and construction of low-cost housing | Nile Breweries Limited | Rehabilitation of factory, complete renovation of houses & extension of bottling storage hall Construction of dispensary and low-cost housing | Jinja |
| Rehabilitation of Kakira Sugar Works factory | Kakira Sugar Works | Rehabilitation of different parts of the factory, such as foundations for the machines, flooring, drainage, etc. Low-cost housing | Jinja |
| Rehabilitation of Nile Brewery factory | Nile Breweries Limited | Rehabilitation of factory, complete renovation of houses & extension of bottling storage hall | Jinja |
| Project | Client | Work Involved | District |
|---|---|---|---|
| Construction of office block for Excel Insurance Company Ltd. on Plot 28, Hannington Avenue, Kampala | Excel Insurance Company Ltd | Construction of a new office block for Excel Insurance Ltd | Kampala |
| Remediation and commissioning of Uganda Wildlife Authority Biosafety Level 2 Laboratory at Queen Elizabeth National Park, Mweya Peninsula | CH2M HILL | Construction and renovation of Wildlife Authority laboratory | Kasese |
| Uganda Biosafety and Biosecurity Laboratory facility upgrades – NARO Regional Diagnostic Lab, NaLIRRI, Nakyesasa | CH2M | Construction of a laboratory building for CH2M in Nakyesasa | Kampala |
| Construction of Climate Change Unit (CCU) annex block at Luzira under the Ministry of Water and Environment | Food & Agricultural Organisation | Construction of new office block | Kampala |
| Construction of office block on Plot 99/100 Buganda Road | MM & Co. Ltd. | Construction of a 7-storey office block | Kampala |
| Construction of two additional floors at the Lugogo Control Centre office block | UG&A Electricity Transmission Co. Ltd. | Construction of two additional floors including IT & telecommunications, electrical & mechanical installations, fire fighting systems & fire extinguishers, internal & external finishes | Kampala |
| Construction of office block at the Ministry of Health Headquarters | Ministry Of Health UG&A | Construction of a 3-storey building including all external works | Kampala |
| Construction of Stanbic Bank branch at 5th Street, Industrial Area | MM & Co. Ltd.Jinja | Construction of bank building | Kampala |
| Construction of Auditor General’s Office in Mbale | Ministry of Finance | Construction of a double-storey building including all electrical & mechanical installations, boundary wall with metal grills, paved access roads & reinforced concrete driveway/parking, landscaping | Mbale |
| Construction of Auditor General’s Office in Jinja | Ministry of Finance | Construction of a double-storey building including all electrical & mechanical installations, boundary wall with metal grills, paved access roads & reinforced concrete driveway/parking, landscaping | Jinja |
| Construction of offices and staff houses in Kidepo Valley Conservation Area – Lot 2 | UG&A Wildlife Authority | Construction of new buildings for offices & staff houses | Kaabong |
| Construction of offices and staff houses in Lake Mburo Conservation Area and Bwindi/Mgahinga Conservation Area | UG&A Wildlife Authority | Construction of new buildings for offices, staff houses, kitchen, pit latrine & waterborne toilet, administration block | Kiruhura |
| Construction of staff quarters and offices for Uganda Wildlife Authority in Kidepo National Park | UG&A Wildlife Authority | Construction of staff quarters & offices for UG&A Wildlife Authority in Kidepo National Park | Kaabong |
| Construction of Lake Victoria Fisheries Organisation Headquarters | Ministry of Finance | Construction of a 3-storeyed building, a conference room, internal roads & parking, all internal & external finishes, electrical & mechanical installations | Jinja |
| Construction of Andre House – Plots 533–534, Block 3, Bugembe, Jinja | Congregation of Holy Cross, District of East Africa | Construction of a new double-storeyed building including internal roads, parking, external & internal finishes, all electrical & mechanical installations including landscaping | Jinja |
| Proposed construction of Stanbic Bank Kakira branch building | Kakira Sugar Limited | Construction of bank building | Jinja |
| Emergency roof repairs on Embassy House and UDC buildings, Phases I and II | Ministry of Education & Sports | Secondary roof on buildings | Kampala |
| Construction of Tororo District Administration Headquarters | Tororo District Local Government | Renovation of existing building; work involved re-roofing, replacement of doors, new structural frame, all electrical & mechanical works | Tororo |
| Alterations and renovation works of UNEB offices at Block B, Plot 35 Martyrs Way, Ntinda | UG&A National Examinations Board | Alterations & renovations to existing buildings, removal & replacement of roof, structural strengthening by adding new columns, addition of two more floors, internal partitioning, roads & landscaping | Kampala |
| Completion of Bushenyi Administration Block | Bushenyi Local Government | External & internal finishing of the building | Bushenyi |
| Renovation works on Plot 12/20 Jinja Road, Kampala | Muljibhai Madhvani & Co. | Renovation of residential flats, construction of parking area, walkways & drainage | Kampala |
| Construction of Gulu Radio Station | The Mediae Company Media For Education & Development | Construction of a two-storey new radio station building | Gulu |
| Renovations of Bank of Baroda, Kampala | Bank of Baroda (U) Ltd. | Renovations to Bank of Baroda | Jinja |
| Rehabilitation of Fisheries Research Institute (FIRI), Jinja | National Agricultural Research Organisation (NARO) | Rehabilitation of fourteen houses & office buildings for NARO | Jinja |
| Renovations to six flats at Madhvani Foundation Building, Phase II | MM & Co. | Renovations to six flats in Madhvani Foundation Building, Kampala | Kampala |
| Renovations to six flats at Madhvani Foundation Building, Phase III | MM & Co. | Renovations to six flats at Madhvani Foundation Building, Jinja Road, Kampala | Kampala |
| Construction of Gulu DFI | Ministry of Agriculture | Construction of buildings & external works for District Farm Institute, Gulu | Gulu |
| Construction of office block for the Economic Policy Research Centre | Economic Policy Research Centre | Construction of two-storey office block | Kampala |
| Alterations and renovation of houses | Muljibhai Madhvani & Co. | Fabrication & erection of 150-tonne tallow tanks including construction of foundations at Oil & Soap Division Alteration & renovation of houses Repair of match factory Replacement of asbestos sheets at Mulco Textiles Construction of kitchen block, paper store & roof at Mulbox | Jinja |
| Extension, renovation, and construction of various buildings for Madhvani Group | Muljibhai Madhvani & Co. | Extension of tea factory at Mwera Estate Complete renovation of Madhvani Building, Nkurumah Road, Kampala Construction of pavilion at Lugogo Show Ground, Kampala External renovation at Madhvani Foundation Building, Jinja Road, Kampala | Kampala |
| Project | Client | Work Involved | District |
|---|---|---|---|
| Provision of procurement and construction for Kingfisher Pre-Drilling Civil Works (PC 1) | Cnooc UG&A Limited | Earthworks, drilling & installation of conductor pipes, road construction — completed in 2023 | Kikube District |
| Civil enabling works: Buffalo East access roads and wellsites, Operation Area Block 1, Uganda | Heritage Oil & Gas Limited | Construction of access roads, well sites & mothballing works | Pakwach |
| Kingfisher, Buffalo, Giraffe, and wellsites | Heritage Oil & Gas Limited | Civil enabling works & road works to rig well site | Kikube |
| Civil enabling works: Kingfisher 3 access roads, wellsite, and base camp, Operation Area Block 3 at Bugoma, Hoima | Heritage Oil & Gas Limited | Construction of new drill pad access roads, flare pit, evaporation pit, cellars, drainage works, perimeter ditches, fencing works & mothballing works | Kikuube |
| Civil enabling works: Kingfisher 2 access roads, wellsite, and base camp at Bugoma, Hoima | Heritage Oil & Gas Limited | Access roads & well sites | Kikuube |
| Civil enabling works: Warthog 1 access roads, wellsite, and base camp, Operation Area Block 1 at Bugoma, Hoima | Heritage Oil & Gas Limited | Construction of new drill pad access roads, flare pit, evaporation pits, cellars, drainage works, perimeter ditches, fencing works & environmental mothballing works | Kikuube |
| Civil enabling works: Giraffe 1 access roads, wellsite, and base camp, Operation Area Block 1 at Bugoma, Hoima | Heritage Oil & Gas Limited | Construction of new drill pad access roads, flare pit, evaporation pits, cellars, drainage works, perimeter ditches, fencing works & environmental mothballing works | Kikuube |
| Civil enabling works: Buffalo 1 access roads, wellsite, and base camp, Operation Area Block 1 at Bugoma, Hoima | Heritage Oil & Gas Limited | Construction of new drill pad access roads, flare pit, evaporation pits, cellars, drainage works, perimeter ditches, fencing works & environmental mothballing works | kikuube |
| Leveling, stabilizing, and construction of Ngassa Drill Platform | Tullow Oil UG&A Operations Pty Limited | Completed in 2007 | Kikuube |
| Construction of Tilenga upstream facilities | Mcdermott | Construction of Temporary Construction Facility (TCF), Operational Camp and Operational Support Base (OC-OSB) and Central Processing Facility (CPF) | Bulisa |
| Early civil works for MCPY3 | EACOP | civil enabling works & road works for main camp yard 3 (MCPY3) | Sembabule |
| Construction of resettlement houses for EACOP in Bulisa | EACOP | Construction of ressetlemnt houses in Bulisa | Bulisa |
| Construction of resettlement houses for CNOOC | CNOOC UG&A Limited | Construction of ressetlemnt houses in Kikuube | Kikuube |
| Construction of Pump Station 1 | EACOP | Civil works for pump station 1 | Hoima |
| Construction of MCPY3 camp | CPP | Construction of concrete foundation and assebly of prefab unitsn for accomodation,electrical and plumbing works. | Sembabule |
| Civil works and fencing of MCPY 4 | CPP | Earth works, and fencing works | Kyotera |
| Project | Client | Work Involved | District |
|---|---|---|---|
| Access and drainage improvement for Kisiro–Bugangu Swamp Crossing along Bugodi–Kisiro–Bugangu Road under Jinja Station | UNRA | Construction of a 2 km ancillary road involving swamp clearance in accordance with NEMA regulations, large-scale earthworks including rock fill, cut & fill, construction of 12 box culverts, and installation of guardrails | Namutumba |
| Rehabilitation and upgrading of roads at Plot 96/98, 5th Street, Industrial Area, Kampala City | MADHVANI GROUP LIMITED | Construction & upgrade of roads at Plot 96/98, Industrial Area, Kampala | Kampala |
| Construction of box culvert and retaining wall at Jinja Nile Bridge | Zenitaka Hyundai JV | Construction of box culvert & retaining wall | Jinja |
| Periodic maintenance of Magodes–Busumbu–Munamba Road (22 km) | UG&A National Roads Authority | Heavy grading, gravel, stone pitching, culvert installation, offshoot cleaning, offshoot excavation | Tororo |
| Routine mechanised maintenance of Soroti–Katakwi Road | UG&A National Roads Authority | Medium grading, culvert, offshoot excavation & cleaning, and gravelling | Soroti |
| Periodic maintenance of Kotido–Kanawat–Abim Road (70 km) | Ministry of Works & Transport | Construction of culverts, heavy grading, installation of concrete pipes | Kotido |
| Routine mechanised maintenance of Kilak–Adilang Road (64 km) | Ministry of Works & Transport | Heavy grading, culvert installation, repair & reconstruction of stone pitching | Amuru |
| Routine mechanised maintenance of Kitgum–Kilak–Lira Border Road (84 km) | Ministry of Works & Transport | Heavy grading, culvert installation, repair & reconstruction of stone pitching, shoulder repair | Kitgum |
| Routine mechanised maintenance of Natete–Nakawuka–Kasanje/Kisubi Road (38 km) | Completed in 2006 | Gulu | |
| Routine mechanised maintenance of Mbarara–Nyakahita Road (60 km) | Ministry of Works & Transport | Grading & regravelling | Kampala |
| Routine mechanised maintenance of Lira Town Roads (10 km) | Ministry of Works & Transport | Pothole filling, surface dressing, shoulder expansion & drainage works | Mbarara |
| Routine mechanised maintenance contract for Isingiro–Rakai Border Road (70 km) | Ministry of Works & Transport | Lime-stabilised murram – 250 m³, premix for potholes – 1000 m², double seal surface dressing – 1500 m² | Lira |
| Bush clearing, removal and storage of topsoil, construction of murram road and parking area | Completed in 2003 | Mpigi | |
| Periodic mechanised maintenance of Kibibi–Kanoni Road (40.5 km) | Ministry of Works & Transport | Full gravelling of 20 km, spot regravelling & placement of 600 dia culverts | Isingiro |
| Periodic maintenance of Bugiri–Nankoma Road (21 km) | BEC Civil Works JV | Construction of approach road with 300 mm thick murram wearing course and parking yard | |
| Emergency works on Mityana–Busunju Road (30 km) | Ministry of Works & Transport | Complete regravelling of 40.5 km road along with rectification/installation of concrete culverts | Mpigi |
| Routine mechanised maintenance of Fort Portal–Kamwenge–Mbarara Border (72 km) | Ministry of Works & Transport | Regravelling of 21 km of road, spot regravelling & installation of culverts | Bugiri |
| Emergency works on Mityana–Busunju Road (30 km) | Ministry of Works & Transport | Medium grading of existing road, spot gravelling & installation of 600 dia culverts | Mityana |
| Routine mechanised maintenance of Fort Portal–Kamwenge–Mbarara Border (72 km) | Ministry of Works & Transport | Spot regravelling of 72 km road including rectification/installation of concrete culverts | Fortportal |
| Routine maintenance of Fort Portal–Kamwenge–Mbarara Road (72 km) | Ministry of Works & Transport | Spot regravelling of 72 km road including rectification/installation of concrete culverts | Fortportal |
| Mechanised maintenance of Sironko–Mutufu–Nakiondwe Road (16 km) | Housing & Communication, Ministry of Works | Completed in 2000 | Sironko |
| Project | Client | Work Involved | District |
|---|---|---|---|
| Renovation and construction of Makerere University Main Building | Makerere University | Construction & restoration of Makerere University main building | Kampala |
| Construction of facilities at Uganda Technical College, Elgon | Ministry of Education & Sports | Construction of new administration block, construction of new girls’ dormitory, construction of generator house | Mbale |
| Construction of new office/classroom block at Uganda Management Institute (UMI) | UG&A Management Institute | Completion of the classroom/office block at UMI | Kampala |
| Construction of multipurpose laboratory block for the Faculty of Applied Sciences at Mbarara University of Science and Technology (MUST) | Ministry of Education, Science & Technology | Construction of multipurpose laboratory block | Mbarara |
| Construction of central teaching facilities and refurbishment of old laboratories at Makerere University, Kampala | Ministry of Education | Construction of 2 new teaching facilities & rehabilitation of existing laboratories | Kampala |
| Proposed improvement of St. Francis Chapel at Makerere University, Kampala | Ministry of Education, Science & Technology | Refurbishment & extension of existing St. Francis Chapel | Kampala |
| Construction of 12 primary schools in the Karamoja region (Napak, Moroto, Nakapiripirit, and Amudat Districts) as part of KPEP–LOT 2 works | Deloitte UG&A Ltd. | Construction of classroom blocks, hostels, staff houses & canteens | Moroto,Amudat ,Nakapiripirit |
| Construction and rehabilitation of facilities at St. Paul Mutolere and Seseme Girls Secondary School | Completed in 2015 | Kyenjojo | |
| Construction of Seed Schools, Lot 8 (Lango College and Pakadha S.S.) | Ministry of Education & Sports | Completion of unfinished dormitory block, construction of classroom blocks, laboratory blocks, library/ICT blocks, staff houses, multipurpose hall, sports facilities & aqua privy toilet | Kisoro |
| Infrastructure development in selected PPET institutions | Ministry of Education & Sports | Construction of: new laboratory block, new library block, new classroom block, new 2-unit staff houses, underground water tank, VIP toilets, food store, electrical works | Lira |
| Supply of furniture to 25 Seed Secondary Schools, ABD III Education Project | Ministry of Education & Sports | Construction of classroom blocks, laboratory blocks, staff houses, VIP latrine blocks & renovation works; borehole drilling, solar power installations & fencing | Moroto |
| Development of Human Resources for Health (DHRH) Project | Ministry of Education & Sports | Construction of classroom blocks, laboratory blocks, dormitory blocks, staff house, VIP latrine blocks & renovation works; borehole drilling, solar power installations & fencing | Nakapiripirit |
| Construction of Gulu Lecture Block | Ministry of Education & Sports | Supply of laboratory stools, student chairs & reading tables, library stacks, double decker & single decker beds, high-back chairs & tables | |
| Construction of PPET institutions in the Karamoja Region | Ministry of Finance, Planning & Economic Development | Rehabilitation of three health training schools; construction of one double-storey administration building & one double-storey hostel block for each of the training schools | Kampala |
| Construction of Seed Secondary Schools, Lots 3 and 6 | Gulu University | Construction of a new 3-storey building including all mechanical & electrical installations, internal & external finishes & landscaping | Gulu |
| Rehabilitation of DHRH Centres at Mengo, Kibuli, and Nsambya Hospitals | Ministry of Education & Sports | Construction of PPET institutions in Karamoja Region, Lot 2 & 3 | Moroto |
| Construction of Seed Secondary Schools, Lot 6, ABD III Education Project | Ministry of Education & Sports | Construction of Seed Secondary Schools, Lot 3 & 6 | Lira |
| Construction of Seed Secondary Schools, Lot 3, ABD III Education Project | Ministry of Finance, Planning & Economic Development | Rehabilitation of DHRH Centres at Mengo, Kibuli & Nsambya Hospitals | Kampala |
| Construction of two County Education Centres in Central Equatoria State at Kapuri–Juba/Luri and Lainya Town | Ministry of Education & Sports | Construction of classroom blocks, administration blocks, laboratory blocks, toilet blocks & sports fields | Moroto |
| Contract for supply and delivery of furniture for primary schools funded by the Royal Netherlands Embassy, Kampala, Lot II – Eastern Region | Ministry of Education & Sports | Construction of classroom blocks, administration blocks, laboratory blocks & sports fields | |
| Construction and rehabilitation of selected PTP Centres in Uganda | Ministry of Education, Science & Technology | Construction of new buildings for County Education Centres in Juba, Southern Sudan | Sudan |
| Construction of laboratories and libraries in selected secondary schools, Lot II | Ministry of Education & Sports | Supply & delivery of furniture to primary schools | Budaka |
| Construction of building for the Institute of Computer Science, Makerere University | Ministry of Education & Sports | Construction of new buildings & rehabilitation of existing buildings for classrooms, dormitories, kitchen & workshops | |
| Rehabilitation of Canon Apolo Core PTC, Fort Portal, Kabarole District, C327/47/2 – Lot 1 and Lot 2 | Ministry of Education & Sports | Construction of new buildings for laboratories & libraries | |
| Proposed library, hall, and classroom block, Phase II, for Old Kampala Senior Secondary School | Makerere University | Construction of a new six-storey building including all associated mechanical & electrical installations & external works | Kampala |
| Proposed library block for Ntare School | Embassy of Irel& | Construction of dormitories, staff houses, classroom blocks, library & laboratory, including playgrounds, roads & parking | Kabarole |
| Construction of Primary Teachers College, Gulu | Old Kampala S.S.S. | Construction of a new multi-storey RCC frame library building | Kampala |
| Renovation of Lincoln Flats and MISR Buildings at Makerere University | Ministry of Education & Sports | Construction of new library block | Mbarara |
| Construction of one hostel at Nyabyeya for the Faculty of Forestry and Nature Conservation | Project Implementation Unit | Construction of classrooms, dormitories, staff housing including landscaping & all infrastructure for the project | Gulu |
| Construction of Medical Library at Mbarara University of Science and Technology, Phase I | Makerere University | Renovation & rehabilitation of residential buildings | Kampala |
| Construction of six-storey building for the Academic Registrar’s Department, Phase II | Makerere University | Construction of one hostel & guest house | Kampala |
| Renovation and extension of the Medical Library at Mbarara University of Science and Technology, Phase II | Mbarara University of Science & Technology | Extension to the library building | Mbarara |
| Construction of Soroti School of Comprehensive Nursing | Makerere University | Construction of six-storey building for the Academic Registrar's Department, Phase II (all finishing work of the building) | Kampala |
| Construction of seven Primary Health Units in Mbale and Pallisa Districts | Mbarara University of Science & Technology | Construction of a new two-storey library building including all furnishing, and renovation of existing library | Mbarara |
| Rehabilitation of Jinja Laboratory Technician’s Training School and Jinja School of Nursing and Midwifery | Ministry of Health | Rehabilitation & renovation of buildings & staff houses of the School of Comprehensive Nursing | Soroti |
| Construction of student’s hall of residence | Care International | Construction of health units | Mbale & Pallisa |
| Proposed new building for Makerere University Business School, Nakawa, Phase I | Ministry of Health | Rehabilitation work | Jinja |
| Construction of Residencial hall for Mbarara university of Science | Mbarara University of Science & Technology | Construction of five-storey students' hall of residence with infrastructure & services | Mbarara |
| Project | Client | Work Involved | District |
|---|---|---|---|
| Construction of Mpanga Market in Fort Portal Municipality | Ministry of Local Government | Construction of Mpanga Market in Fort Portal Municipality, Kabarole District | Fortportal |
| Construction of Bombo Town Water Supply System | Ministry of Water, L&s & Environment | Construction of a 260 m³ overhead reservoir on a 20 m tower, installation of borehole pumps, laying of 22 km UPVC & HDPE pipelines, and 175 service connections | Kampala |
| Supply & installation of five pressed plated tanks at Buwenge, Kamuli, Pallisa, Kayunga & Bukoto | Eastern Centres Water & Sanitation Project | Construction of high-capacity tanks on a fifteen-metre-high structure, fencing & pipework | Kamuli,Pallisa,Kayunga |