Earthworks ( Top soil removal and common excavation to spoil, Fill and improved sub grade layers with;
Minimum G7 quality material in fill (116,845m3)
Class DR dumped rock to fill in swamps)
Ancillary road works
Construction of 8No box culverts (5000x3500x18000M)
Construction of 4No box culvert (5000x4000x18000M)
Construction of new drill pad access roads, flare pit, evaporation pit, cellars, drainage works, perimeter ditches and fencing works and mothballing works.